TS2000

TS2000 For a larger view, please mouseover the image.
For a larger view, please mouseover the image.
Item Description
1 Buffer/barrier fluid IN (G1/2")
2 Buffer/Barrier fluid OUT (G1/2")
3 Cooling water IN (G1/2")
4 Cooling water OUT (G1/2")
5 Filling connection with plug (G1/2")
6 Pressure gas connection (G1/2")
7 Connection for level switch or level indicator (G2")
8 Connection for refill unit (G1/8")
9 Universal connection (G1/2" for safety valve, flare, etc.)
10 Bracket for refill unit
11 Sight-glass
With the EagleBurgmann TS2000 thermosiphon system it is possible to supply buffer/barrier fluid to double and tandem mechanical seals for a broad range of applications. The range is available in 2 different pressure levels with dished heads, sight-glass for level monitoring and with or without cooling coil. TS vessels are equipped as standard with all the necessary system connections and brackets. The modular system allows the TS2000 vessels to be combined with a wide range of system components such as, level switch, circulation pump, hand refill pump, thermometer, base frame, etc.

Circulation based on API 682 / ISO 21 049: Plan 52, Plan 53A
  • Modular system: combination with a wide range of system components possible
  • Vessel made of 1.4571 stainless steel / borosilicate sight-glasses: suitable for universal applications
  • Available with or without cooling coil
  • Sockets with recessed gasket: no contamination of the circuit by thread sealant
  • PED 2014/68/EU (Design and production in accordance with EU Pressure Equipment Directive)
  • ASME VIII, Div. 1 (Design, calculation and production)
  • SELO, TR CU on request
  • Chemical industry
  • Petrochemical industry
  • Oil and gas industry
  • Refining technology
The TS system performs all the basic functions of a buffer/barrier system for the operation of double seals:
  • to pressurize the buffer chamber
  • leakage compensation
  • buffer/barrier fluid is circulated by thermosiphon effect or external circulation system
  • to cool the seal
  • to selectively absorb product leakage and prevent dry running (tandem arrangement)
Use compressed air or nitrogen for pressurization.

Circulation in accordance with API 682 / ISO 21 049: Plan 52, Plan 53A